Technical Services Department for Construction Projects

A dedicated technical services department managing submittals, technical queries and engineering coordination on construction projects across Saudi Arabia.

Request a Quote
Illustrative photo · Daniel McCullough / Unsplash

On most subcontracted scopes, a technical query sits in someone's inbox until it blocks progress on site — nobody owns resolving it, so it waits for whoever notices the delay first. A shop drawing needs sign-off, a detail doesn't match between two trade packages, a material substitution needs confirming against spec — none of it is complicated, but all of it stalls a programme when there's no one whose job is specifically to chase it down and close it out. It's rarely one big unresolved question that derails a programme — it's a backlog of small ones, each waiting on a different person who was never formally made responsible for answering it, that adds up to weeks of avoidable delay by the time anyone tallies them.

Our technical services scope covers shop drawing review and submittal management, technical query resolution between our scope and the design team or main contractor, and coordination of engineering details across the trades we're responsible for. Queries are logged and tracked to closure rather than left as open items nobody's accountable for, and coordination happens before a clash reaches site, not after it's already built. A submittal log is kept current enough that anyone on the project — ours or the main contractor's — can see what's approved, what's pending and what's overdue without chasing an email thread to find out.

This function mattered most on a project like the Institute of Public Administration in Jeddah, where the external granite cladding used a mechanical fixing system — the kind of detail that genuinely needs shop drawings reviewed, tolerances confirmed and technical queries closed out before installation, not resolved on site by guesswork. It's a quieter function than project management or safety supervision, but an unanswered technical query is just as capable of stopping work on site as a missing delivery.

The technical services department runs alongside project management and quality-and-safety supervision on the same support-engineering team — one function that owns the engineering detail behind the schedule, rather than a gap between the design team and the trades actually building the work.

What's in scope

  • Shop drawing review and submittal management
  • Technical query resolution with the design team or main contractor
  • Engineering detail coordination across the trades we're responsible for

How we deliver this

  1. 01

    Shop drawing review

    Shop drawings are reviewed and submittals managed before work proceeds against them.

  2. 02

    Query logging

    Technical queries are logged as they arise, with a named owner rather than left in an inbox.

  3. 03

    Cross-trade coordination

    Engineering details are coordinated across the trades we're responsible for before a clash reaches site.

  4. 04

    Tracking to closure

    Queries are tracked to closure rather than left as open items nobody's accountable for.

  5. 05

    Live submittal log

    A submittal log is kept current so anyone on the project can see what's approved, pending or overdue.

  6. 06

    Support-engineering integration

    Technical services runs alongside project management and quality-and-safety on the same support-engineering team.

Submittals: what is reviewed and why the route matters

A submittal is a document or sample sent for approval before the related work is ordered or built. The usual route runs from the trade contractor to the main contractor, then to the consultant and sometimes the owner, and back with a status such as approved, approved as noted, revise and resubmit, or rejected. Work started on unapproved material risks being removed.

SubmittalWhat the reviewer checksTypical problem
Shop drawingsDimensions, fixings and interfaces with other trades, against the design drawingsConflicts between trade packages found only after fabrication
Product data sheetsThat stated performance meets the specificationA similar-looking product with a different rating
Samples and mock-upsColour, texture, finish and standard of workmanshipApproval given on a sample the delivery does not match
Method statementsSequence, equipment and safeguards for the workSteps that conflict with the manufacturer's instructions or another trade's work area
Finish and door schedulesType, colour and location of every itemSchedules that disagree with the drawings

Technical queries: writing them so they get closed

A technical query, often called a request for information, is the formal way to resolve a gap or conflict in the design documents. Vague or misaddressed queries sit unanswered, so a good one follows this pattern.

  1. Cite the drawing numbers and specification clauses involved
  2. Describe the conflict in a sentence, with a sketch or marked-up photograph
  3. Propose a solution instead of only asking
  4. State the date an answer is needed and what depends on it
  5. Address it to the party who can decide, and give it a reference number

Where documents disagree, the contract normally sets an order of precedence between them, and checking that order early prevents arguments over which drawing governs. A query should stay open on the log until the answer is issued and the drawings are revised, not when a reply lands in someone's inbox.

Coordination drawings and checks between trades

Coordination happens on paper first because that is where it costs least. Typical checks include the following.

  • Reflected ceiling plans overlaying lights, air diffusers, sprinklers, speakers, cameras and access panels, so the ceiling layout works for every service. See Ceiling Systems (All Types) and MEP Works.
  • Wall build-ups against services, so pipes and boxes fit within the wall thickness and partition type. See Gypsum & Cement-Board Partitions.
  • Fixture and tile layouts in wet areas, so outlets land on the finished centre lines
  • Structure-to-finish tolerances, where the built structure is out of line with the drawings and cladding, doors or joinery must absorb the difference
  • Facade fixing systems, where anchors, brackets and tolerances need drawing approval before fabrication. See Granite & Marble Cladding.

At Institute of Public Administration, the external granite used a mechanical cladding system, the kind of detail where shop drawings, tolerances and open queries need closing before installation.

Substitutions and the submittal log

Substitution requests, often prompted by supply delays, are a frequent source of trouble. A responsible request shows the proposed product's data against the specified performance, notes any effect on compatibility with adjoining materials, and is approved in writing before anything is ordered. The submittal log keeps all of this visible. A useful log lists, for each item:

  • The item and its specification clause
  • The date submitted and the current status
  • The date it is needed on site
  • Who currently holds it

Technical services on an Ashlaar project sits with project management and quality-and-safety supervision on one support-engineering team and works to the approved design, coordinating rather than developing it, as Supervision & Consultancy explains. See Project Management & Scheduling for how these dates feed the programme.

What's handled by another capability

  • Design development — we coordinate against the approved design, not author it
  • Programme scheduling and progress tracking — see Project Management & Scheduling
  • Quality inspection and safety supervision — see Quality & Safety Supervision

Projects that evidence this trade

Wide-angle exterior of the stone-clad building, with a curved blue-glass band and the glazed entrance still in scaffolding above wide steps.Government

Institute of Public Administration

JeddahFinishing Contractor

External granite cladding

22 photos
Finished tiered black stone fountain at the centre of a compass-rose marble floor in brown, cream and dark marble.Government

Prince Sultan University of Engineering

Al KharjFinishing Contractor

Large-scale finishing

22 photos
Hospital exterior in grey-beige cladding with scaffolding still standing at both towers, and unfinished asphalt and kerbs in front.Government

Omron General Hospital

Al AhsaFinishing Contractor

Architectural finishing

10 photos

Frequently asked

What kind of technical queries does this function handle?

Shop drawing review, submittal management, and resolving detail mismatches or material questions between our scope and the design team or main contractor.

Is this a design service, or coordination of an existing design?

Coordination — we work to a project's approved design and engineering drawings, resolving technical queries and submittals against them rather than developing the design itself.

Why does a finishing and structural contractor need a dedicated technical services function?

Because unresolved technical queries stall a programme as often as a missing material does — someone has to own closing them out, not just raising them.

Can anyone on the project see what's approved and what's still pending?

Yes — a submittal log is kept current enough that anyone on the project, ours or the main contractor's, can see what's approved, pending or overdue without chasing an email thread to find out.

Is coordination handled before or after a clash reaches site?

Before — engineering details are coordinated across the trades we're responsible for so a clash is caught on paper, not discovered once it's already built.

How are technical queries tracked once they're raised?

They're logged and tracked to closure rather than left as open items nobody's accountable for — the same discipline applied to every submittal and shop drawing on the project.

What is the difference between a shop drawing and a design drawing?

A design drawing shows what the designer intends. A shop drawing, prepared by the trade contractor, shows how that trade will build it: exact dimensions, fixings, joints and interfaces. The consultant reviews it to confirm it follows the design intent; it does not replace the design.

What happens if a material is not yet approved when it arrives on site?

It should not be installed until approved. Unapproved material risks rejection and removal, which costs more than the wait. Check the submittal log for status before ordering and again before delivery, especially for items with long ordering periods.

Who resolves a conflict between the architectural and MEP drawings?

The designer or consultant decides. The contractor's job is to spot the conflict early, raise it as a technical query with references and a proposed solution, and hold the affected work until the answer is issued. The contract's order of precedence says which document governs if nothing else is decided.

Planning a project? Let's talk finishing.

Tell us about your scope and timeline — our technical team will respond with a clear, considered proposal.