What does Ashlaar specialise in?

We are a finishing and fit-out specialist contractor — architectural finishes, granite and marble cladding, MEP, structural works and supervision — for government and commercial projects across Saudi Arabia.

How long has Ashlaar been working in the Kingdom?

Since 2000.

Does Ashlaar work on projects near Al-Balad, Jeddah's historic district?

We haven't published a named project from inside Al-Balad itself. Heritage-adjacent work in Jeddah calls for careful, conservation-sensitive finishing, so ask any contractor, including us, for comparable examples.

More on Jeddah →
Is Ashlaar based in Jeddah, or does it travel here for projects?

Based here — Jeddah is our head office and where we've delivered more projects than in any other city, including the Institute of Public Administration and Safwa Tower's residential complex and mosque minaret.

More on Jeddah →
What is the "Riyadh Region" as opposed to just "Riyadh"?

Riyadh Region is the wider administrative province — the capital city itself plus smaller governorates around it, including Al Kharj, Huraymila and Muzahmia, where we've each delivered a higher-education campus finishing project.

More on Riyadh Region →
Do you only take on large government or institutional projects?

No — our projects run from government, university and hospital finishing scopes down to private villas and a residential compound.

More on Why Us →

Services & capabilities

Do you build swimming pools and fountains?

Yes — both sit under our external and facade works: pool structural shell, waterproofing, pool-rated tiling and deck finishing, and for fountains the waterproofed basin, recirculation plumbing and stone or tile finishing.

Do you handle MEP works, or only finishes?

Both. Alongside the finishing trades we carry out electrical and plumbing works, and low-current systems including CCTV, security and data networking.

Can you carry out structural works as well?

Yes — concrete and steel works, and steel canopies and car shades.

Do you provide supervision and project management?

Yes. Our supervision and consultancy work covers project management, quality and safety on site, and technical services such as shop drawings and coordination.

What does a finishing scope usually cover?

It varies by project, but typically plastering and screeding, gypsum partitions and ceiling systems, flooring, painting, doors and windows, safety railings, and specialist items such as phenolic cubicles or epoxy flooring where the building needs them.

Do you take on both government-scale and residential architectural finishing?

Yes — our projects range from a university campus to a private villa; scale changes the programme, not the approach to the work.

More on Architectural Finishing →
Can Ashlaar work as a subcontractor to a main contractor for finishing only?

Yes — most of our government and commercial project record is exactly this: finishing contractor to a main contractor, coordinating our programme with theirs rather than running the whole site.

More on Architectural Finishing →
Which sub-services fall under architectural finishing?

Eleven, from plastering and flooring to ceilings, partitions, painting, safety railings and wet-area waterproofing — see the full list below.

More on Architectural Finishing →
Do external and facade works run as one coordinated scope, or as separate contracts?

One coordinated scope — cladding, terrazzo, roof treatment, hardscaping, pools and fountains can be sequenced together on a single project rather than treated as unrelated trades.

More on External & Facade Works →
Can you take on a single element — like granite cladding — without the rest of the external works scope?

Yes — each of these six areas can be engaged on its own; some of our projects show several of them delivered together on the same building, but each has its own scope and pricing.

More on External & Facade Works →
Which sub-services fall under External & Facade Works?

Six, from roof waterproofing and granite/marble cladding to wash terrazzo, hardscaping, swimming pools and fountain works — see the full list below.

More on External & Facade Works →
Do you handle all four MEP trades as one team, or as separate subcontractors?

One accountable team coordinates them — electrical, plumbing, CCTV and networking are planned together, sharing the same containment planning and first-fix sequencing rather than four subcontractors resolving clashes on site.

More on MEP Works →
Is MEP delivered as a standalone specialism?

MEP is delivered as a coordinated part of the finishing scope rather than a standalone specialism — for example the MEP-coordinated fit-out on the Drug Control Department Tower in Riyadh.

More on MEP Works →
Which trades fall under MEP Works?

Four — electrical, plumbing, CCTV & security, and networking — see the full list below.

More on MEP Works →
Do you handle structural design, or only execution?

We execute structural work to a project's engineering drawings — formwork, reinforcement, steel fabrication and erection; design development is coordinated with the client's structural consultant where one is appointed.

More on Structural Works →
Do concrete, steel and canopy work sit under one team, or separate subcontractors?

One accountable team coordinates all three, from concrete through to the steel frame and its covering, rather than three separate subcontractors each responsible for only their piece.

More on Structural Works →
Which sub-services fall under Structural Works?

Three — concrete structures, steel structures, and canopies & car shades — see the full list below.

More on Structural Works →
Do project management, technical services and quality & safety run as one team, or three separate functions?

We aim for one support-engineering team to cover all three — the same team tracking the schedule also resolves technical queries and inspects quality and safety, rather than three separate consultants layered on top of the project.

More on Supervision & Consultancy →
Does supervision and consultancy replace the need for an independent third-party consultant?

No — where a project requires an independent, client-appointed consultant for design or certification, our supervision team coordinates with them rather than replacing that role. What we provide is the day-to-day management, technical coordination and quality/safety discipline across our own construction scope.

More on Supervision & Consultancy →
Is this capability scaled down for smaller, private projects?

The scope scales with the project — the same reporting and technical oversight approach applies whether the project is an institute-scale government building or a private villa, adjusted to the size of the site.

More on Supervision & Consultancy →
Which functions fall under Supervision & Consultancy?

Three — project management & scheduling, the technical services department, and quality & safety supervision — see the full list below.

More on Supervision & Consultancy →
Can Ashlaar keep pace with Riyadh's fast-moving commercial construction market?

We aim to track our own programme against the main contractor's critical path rather than work to a static schedule. Riyadh's Grade A office market held around 98% occupancy through late 2024 into mid-2025 — a market where a delayed fit-out has a real cost.

More on Riyadh →
Do you handle industrial or logistics-facility finishing, not just retail and offices?

Our project in Dammam is a retail one — Marina Mall's interior finishing and flooring. Industrial and logistics buildings are a growing category around Dammam and the port; if you have one, tell us the scope and we'll say plainly whether it's work we take on.

More on Dammam →
Do you take on healthcare-facility finishing outside Al Ahsa too?

Yes — Omran General Hospital in Al Ahsa and our public health unit project are both healthcare finishing scopes, delivered as finishing contractor to a main contractor.

More on Al Ahsa →
Does Al Kharj's industrial and agricultural base change how you specify materials?

It can — an industrial or agricultural-adjacent building often has different exposure and load requirements than a purely commercial or residential one, and finishes and systems should be specified against the actual building use, not a generic template.

More on Al Kharj →
Which sectors make up your Riyadh Region project record?

A mix of government, commercial and residential work — government campuses in Al Kharj, Huraymila and Muzahmia plus a government tower in Riyadh city, commercial malls and an office building, and one residential compound.

More on Riyadh Region →
How do you handle work across your five capabilities?

One accountable team coordinates the trades across architectural finishing, external & facade works, MEP works, structural works, and supervision & consultancy, so you deal with a single point of contact rather than a chain of separate packages.

More on Why Us →
Can you work as a finishing contractor under our own main contractor?

Yes — most of our projects were delivered exactly this way: as finishing contractor to a main contractor, coordinating our programme and submittals with theirs rather than running the whole site.

More on Why Us →

Choosing a contractor

Why should we choose you over a lower quote from another contractor?

We won't tell you a lower quote is automatically wrong — but our own guide to choosing a contractor flags exactly what a dramatically lower price usually means: a corner cut somewhere hard to inspect after handover. Ask any contractor, including us, the same scope, classification and paperwork questions before deciding.

More on Why Us →

Ask about your project

Process & programme

Do you work as a finishing contractor for main contractors?

Yes. We deliver finishing scopes for main contractors such as Hadeem Contracting and Consultancy Group, as well as directly for project owners.

Ask about your project

How do I request a quote?

Share your scope and timeline on WhatsApp, by phone or by email, and our technical team will reply as soon as it can.

Ask about your project

What do you need from me to prepare a quote?

The location, the scope of work, the stage the project is at, and your intended start date. Drawings or a bill of quantities help us be more precise; if you do not have them yet, describe the work and we will tell you what else we need.

Ask about your project

How is architectural finishing sequenced with other trades on site?

Plaster and screeding come first, partitions and ceilings close in the order MEP needs to run cleanly behind them, and painting and fixed joinery follow so nothing gets marked before handover.

More on Architectural Finishing →

Ask about your project

Do you supply materials or do we specify them?

Either — we can work to a specified material schedule from your design team, or advise on options during the material-selection stage before submittals go in.

More on Architectural Finishing →

Ask about your project

How do you sequence external works so pool, hardscape and cladding trades don't conflict with each other?

Where a project includes more than one of these elements, they're planned and sequenced together from the start — hardscaping around a pool or fountain, cladding coordinated with roof treatment on the same elevation — rather than run as separate trades working around each other.

More on External & Facade Works →

Ask about your project

Do external works get the same inspection standard as interior finishing?

That is the aim — each wet-critical or structurally-fixed element (roof membranes, pool shells, cladding fixings) should be inspected before it's covered or signed off, the same discipline applied to interior finishing.

More on External & Facade Works →

Ask about your project

Is MEP work tested before it's closed behind a finish?

It should be — every electrical circuit needs testing and every plumbing line pressure-testing before it's chased into a wall or covered by a ceiling, whichever of the four trades is involved.

More on MEP Works →

Ask about your project

How is MEP sequenced with the rest of the finishing programme?

First-fix — containment, conduit and rough-in — happens while walls and ceilings are still open, coordinated with plaster, ceiling and flooring trades; second-fix devices, fixtures and connections go in once those finishes are ready, and everything is tested before final sign-off.

More on MEP Works →

Ask about your project

Why coordinate structural work as one scope instead of splitting it across separate subcontractors?

Because it's the trade where a supervision gap is hardest to correct after the fact — a poured column or an erected frame doesn't get fixed later, so one accountable team should follow the reinforcement and connections through to the finished element.

More on Structural Works →

Ask about your project

Is structural work inspected before the next trade closes over it?

It should be — reinforcement needs checking before the pour, formwork before it's struck, and bolted or welded steel connections before cladding, roofing or any finish closes over them, at every stage rather than only at final handover.

More on Structural Works →

Ask about your project

How does Ashlaar catch quality or safety issues before they become expensive?

Inspection is built into the programme at each trade handover, not only at project milestones — work that doesn't match the drawings or approved submittals is flagged and corrected before the next trade builds on top of it.

More on Supervision & Consultancy →

Ask about your project

Does Ashlaar handle the Balady building-permit process?

We're appointed as the building contractor once a project's design has cleared Balady's review and received its design-approval certificate. From there, our technical services department manages submittals, technical queries and coordination with your design office and Balady inspectors through construction — rather than owning the original permit application itself, which stays with your appointed engineering office.

More on Jeddah →

Ask about your project

Does building on Dammam's coastal sabkha soil change how you approach foundations?

It can — coastal sabkha is documented along the Eastern Province shoreline and is known in geotechnical practice for low bearing capacity and a shallow water table, so foundation design there starts with a genuine site investigation rather than a spec carried over from an inland project.

More on Dammam →

Ask about your project

How is quality checked on site, not just promised in a proposal?

Our approach is to build inspection and sign-off into the programme at each trade handover rather than relying on a single final walkthrough before handover. Ask any contractor to show you where those checkpoints sit in their programme.

More on Why Us →

Ask about your project

What happens if a defect shows up after handover?

Tell your technical contact directly and it gets assessed and actioned — the specific terms depend on your contract, which our technical team will confirm with you before work starts rather than leaving it vague.

More on Why Us →

Ask about your project

Areas we serve

Where do you operate?

Across the Kingdom. We have delivered projects in Jeddah, Riyadh, Dammam, Al Ahsa, Al Kharj, Huraymila and Muzahmia, among others.

Do you have a local office in each city you work in?

No — our office is in Jeddah, and we travel to site in every city we work in, from Riyadh and Dammam to Al Ahsa, Al Kharj, Huraymila and Muzahmia.

How does Jeddah's humidity affect a finishing or facade programme?

More than the temperature does. Average humidity of around 65% (spiking above 85% in summer) drives real corrosion risk in reinforcement and metalwork and stresses concrete and coatings — which is why waterproofing, mechanical cladding fixings and corrosion-resistant detailing should be part of the specification on a Jeddah project, not optional upgrades.

More on Jeddah →
How does Riyadh's climate affect a construction programme?

Less than you'd expect from the peak heat alone — the bigger factor is the daily swing between a hot day and a much cooler night, typically 11–13°C year-round. That swing is what concrete joints, cladding fixings and expansion detailing have to allow for on a Riyadh project, not just the average temperature.

More on Riyadh →
Is Dammam growing fast enough to justify a finishing contractor scaling up there?

The scale of committed development says so — the New Dammam waterfront project alone is a SAR 98 billion, 32 million sqm master-planned development with over 21,000 plots, on top of an already-expanding port and logistics sector.

More on Dammam →
Does building near the Al-Ahsa Oasis require extra planning approval?

It can — the oasis has carried UNESCO World Heritage status since 2018, and heritage-designated land generally carries planning and design-review requirements beyond a standard site; the exact controls depend on the specific parcel and its location relative to the protected area, which our technical team confirms case by case rather than assuming a blanket rule.

More on Al Ahsa →
Is Al Ahsa's climate different enough from Dammam's to change how a facade is specified?

Yes — Al Ahsa is inland and runs a drier, more extreme desert profile (summer highs near 45°C, a wider day-night swing) than Gulf-coast Dammam, closer in character to Riyadh's interior heat, and exterior specification follows the actual site climate rather than a single Eastern Province default.

More on Al Ahsa →
How far is Al Kharj from your Riyadh city projects?

About 80km southeast of Riyadh. We're based in Jeddah and travel to site, so Al Kharj is scoped and mobilised on its own project timeline.

More on Al Kharj →
How far is Huraymila from Riyadh and Al Kharj?

About 89km northwest of Riyadh. We're based in Jeddah and travel to site, and each Riyadh Region project is scoped and mobilised on its own timeline.

More on Huraymila →
Is Muzahmia close to your other Riyadh Region projects?

It sits west of Riyadh on the Riyadh–Mecca Highway corridor, in a different direction from Al Kharj (southeast) and Huraymila (northwest). We're based in Jeddah and travel to site, so each is scoped and mobilised on its own project timeline.

More on Muzahmia →
Are Al Kharj, Huraymila and Muzahmia close enough to mobilise together?

They sit in different directions from Riyadh — Al Kharj southeast, Huraymila northwest, Muzahmia west — so each is scoped and mobilised on its own project timeline, with the team travelling from Jeddah rather than working from three separate local setups.

More on Riyadh Region →

Trust & verification

Are you a registered, compliant company?

Ashlaar is the trading name of a general contracting establishment registered in Jeddah — Unified National Number 7041437497, VAT registration 312453700200003. The full details, and the commercial registration certificate itself, are published on our company information page so you can verify them independently rather than take our word for it. The business has operated in the Kingdom since 2000; the current registration dates from 2024, when it was rebranded as Ashlaar. Contractor classification details are available on request.

What are Riyadh's dust-control rules for construction sites?

Riyadh's dust-control rules apply to any project of 2,000 sqm or larger, with fines of up to SAR 50,000 per violation. If your project is above that size, ask us how we would plan for dust suppression, covered truck loads and site watering in the programme.

More on Riyadh →

Projects & evidence

What types of projects do you take on?

Government and institutional buildings, universities, hospitals, malls, towers, compounds and private villas — large or small.

Can you show references or photographs from past projects?

Our projects pages carry photographs from the work itself, by project and by city. If you need references for a specific type of building or scope, ask us and we will point you to the closest comparable work.

What kind of villa work has Ashlaar delivered in North Jeddah?

Four private villa projects so far — Private Rest House, and turnkey finishing for the Khalid, Fahad and Ali villa projects — in the same broader North Jeddah corridor that includes coastal communities like Obhur.

More on Jeddah →
What kind of projects has Ashlaar delivered in Riyadh?

Six so far, spanning retail (Marina Mall's decorative porcelain flooring, Badiah Mall, Olaya Mall), residential (Olaisha Compound), commercial office space and a government office fit-out (the Drug Control Department Tower's MEP-coordinated works) — the same range of project types as our Jeddah portfolio.

More on Riyadh →

The right scope, from the start

Your project starts with a clear conversation

Tell us the location, trades and current stage. Talk through what your project needs with the Ashlaar team.